ESBRO GVX01 (Sweden)

Location: Gävle, Sweden
System Standard: EN 62305 & EN 50522
Client: Suir Engineering
Scope of work: Supply, installation and commissioning of
Structural Lightning Protection System. Supply, installation and commissioning of Site Wide Earthing Network. LPI installed 400sqm earthing cable within the data hall and 8mm copper cable to the lightning protection network at roof level. All underground connections were exothermically welded.
Duration: 12 month contract